Data Room
Minerals/Quarrying
- Mine Design Plans
- Guidelines Document_ Application for a Mining Licence
- Guidelines Flow Chart – Mining Licence
- Guidelines Document_ Application for a Processing Licence
- Guidelines Flow chart – Processing Licence
Safety and Environment
Storage
- MEEI Service Station Inspection Checklist
- LPG Installation Checklist
- LPG Storage Application Form – Instructions
- LPG Storage Application Form
- Horizontal Aboveground Storage Tanks Checklist
Technical Guidance Documents
Approved List of CVAs – May 2015
- GD 05: Verification Scheme For Hydrocarbon Production And Processing Facilities
- GD 04: Verification Scheme For Pipeline Systems
- GD 03: Verification Scheme For Offshore Structures
- GD 02: The Role of the Certified Verification Agent (CVA) in The MEEI’s Approval Regime
- GD 01: Guide To MEEI’s Approval Regime For Energy-Based Facilities
- CODE of Practice for Subsurface Safety Devices Apr 1996
- Drilling Guidelines
- Guide to MEEI approval for development plans
- Abandonment of Wells
Transportation
Competitive Bid Round
- Annex E- Procedure for the Determination of Work Units
- Final 2012 Deep Water Techincal, Legal and Commercial Presentation
- PGS 2012 Presentation on Trinidad
- International Roadshow Presentation (IP and Nape Expo 2012)
- Bid Data Packages 2012
- Bid Data Packages by Location
- 2010 CBO Data Use Agreement
- Final Deep Water PSC Documents
- PSC Stakeholder Letter
- 2010 Draft Deep Water Model PSC (2012 version to be added)
- Annex D- Marketing Procedures For Gas
- Annex C- General Provisions
- Annex B- Data To Be Submitted By Licensee
- Annex A- Description of Area
- PGS MC2D Overall Programme
- Notes on the PSC
- 2010 Competitive Bidding Order (2012 version to be added)
- Prequalification Criteria for Participation in Competitive Bid Round
- Local Content & Local Participation Framework